Feature · DPGF

The pricing breakdown (DPGF) software synced with your specification

Enter your project once and get a pricing breakdown (DPGF), structured by trade, aligned with the specification and the take-off, ready to send out for consultation, with no re-entry.

Request access

Why a dedicated pricing breakdown tool?

Building a pricing breakdown in Excel means re-typing the specification items by hand, re-pasting the take-off quantities and hoping nothing has moved since the last version. One omission, and the bids you receive are no longer comparable.

A dedicated tool builds the priced breakdown straight from the specification and the take-off: every price line matches a described work item, and the template sent to contractors stays consistent with the rest of the tender package.

How it works

Three steps, a single entry:

  • Describe the project and its specification: the trades and pricing lines pre-fill from the selected articles.
  • Link the take-off quantities: the priced breakdown aligns with the work items, with no re-keying.
  • Export a polished pricing breakdown, ready for contractors to fill in, and attach it to the tender package.

What you get

  • A priced breakdown structured by trade, aligned with the specification.
  • Quantities from the take-off, with no double entry or re-pasting from Excel.
  • A polished export, one template per trade, ready to share and fill in by contractors.
  • Genuinely comparable bids: every contractor prices the exact same scope.

Specification and pricing breakdown: the "what" vs the "how much"

The specification describes the work — the "what" and the "how"; the pricing breakdown gives its priced detail — the "how much". Two distinct documents in the package, but one single project dataset.

In BuildOS, the specification, the take-off and the pricing breakdown share that data: change an article or a quantity and the priced breakdown realigns. The result: fewer omissions, a package that stays consistent from brief to site, and data that flows instead of being re-entered.

Frequently asked questions

What is the difference between the CCTP and the DPGF?

The CCTP (specification) describes the work (the "what" and "how"); the DPGF (pricing breakdown) gives the priced detail (the "how much"). In BuildOS both documents share the same project dataset.

Does the pricing breakdown stay synced with the specification and the take-off?

Yes. The pricing lines derive from the specification articles and the quantities come from the take-off. A changed value propagates, with no re-pasting in Excel.

Are the bids received comparable?

Yes: every contractor fills in the same template, aligned with a single scope. You compare genuinely comparable bids, without re-pasting figures by hand.